CVR · GL-1 · MULTIFUNCTIONAL UGVIN PRODUCTION
Unattended · Indoor/outdoor logistics
GL-1
Carries a robotic arm, sensor mast, or rack and powers it. Runs unattended on mapped routes by visual SLAM, no GNSS required, supervised from one command center.
Max Payload
454 kg
1,000 lb rated
Battery
9–27 kWh
LFP · modular
Runtime
8–24 h
By battery option
Compliance
NDAA / BAA / TAA
Optional config
Built In
Detroit, USA
Domestic supply chain
01 · Payload Profiles
Six jobs.
One base.
Standard mounting grid, data ports, and power at a selectable voltage.
Robotic Arm
Arm on the grid, powered from the base.
Material Movement
Loads across docks, corridors, and aisles.
Sweeping
Factory-fit sweeper cleans while the base runs its route.
Inspection & Inventory
Sensor mast for routine checks of assets, racks, and perimeter.
Hauling
Racks and carts on the deck across the site.
Municipal Services
Outdoor package for yards, ramps, and mixed routes. IP55 sealing.
02 · Partner facility
In the field.


03 · Specifications
Specifications.
PAYLOAD & INTEGRATION
Max Payload454 kg (1,000 lb)
MountingStandardized grid
Data / InterfaceGbE · CAN · USB-C · 10" HMI
POWER
BatteryLFP · 9 kWh (18 / 27 kWh opt.)
Runtime8–24 h · By battery
Charge3 h @ 220 V · 6 h @ 110 V
MOBILITY & AUTONOMY
Drive2WD front · RWS (swerve opt.)
Max Speed2.0 m/s
SensingVisual SLAM · 360° FOV
AutonomyUnattended · Mapped routes · No GNSS
PHYSICAL & ORIGIN
Dims (L×W×H)1327 × 812 × 333 mm
Curb Weight150–250 kg
Supply ChainNDAA / BAA / TAA opt. · Detroit, USA
04 · Facility Pilot
Evaluate GL-1 on one route.
SCOPEEvaluate on one mapped route in your facility● ONE ROUTE
CVR PROVIDESSite survey, the robot, supervision, acceptance review● INCLUDED
LEAD TIMEFrom PO to on-site● 5 WEEKS
AFTERPurchase or service agreement on acceptance● YOUR CALL
OTHER SYSTEMS
05 · Program Status
Where it stands.
FIELDEDResident at a DLA distribution depot under a prime contractor● SINCE JUL 2026
NEXT UNITSecond variant requested by the customer● IN WORK
INTEGRATEEval units — mount and validate your payload● BY REQUEST
PRODUCTIONProduction fleets · 5-week lead time from PO● NOW
06 · How to Buy
How to buy.
VENDOR
CAGE1ZXW1
UEIVGWANEA5FQJ4
SAM.govActive · All Awards
Business sizeSmall business
ORDERING
How to buyCommercial item. Orders under the simplified acquisition threshold.
Lead time5 weeks from PO
Program inquiriesArnold Kadiu, Founder & CEO · partners@us-cvr.com
07 · CONTACT
Put GL-1
to work.
Tell us the route, the payload, and the facility. You'll get a pilot scope and budget within two business days.
Or email partners@us-cvr.com

